CRAGIEBURN WATER TREATMENT PLANT 

CLIENT:  CPB Contractors - Yarra Valley Water

PROCESS:

The Craigieburn Sewage Transfer Hub provides capacity in Yarra Valley Water’s sewerage system to accommodate projected growth in the Hume corridor to the north of the Craigieburn Sewage Treatment Plant STP007.

The facility transfers untreated dry weather inflows to the existing downstream sewerage catchments. untreated wet weather sewage inflows will be temporarily stored, due to the limited capacity of the existing downstream sewerage systems, which only have capacity to accommodate peak dry weather flows. 

SCOPE OF WORK:

​

Works undertaken on the project included the development of Design Drawings, Switchboard Manufacture and the Installation of the entire electrical scope. The Project was divided into several areas, each area comprised of switchboards with report I/O integrated back to the main switch room.

yarra-valley-water-logo-331x262.png

All work completed in accordance with all applicable regulations, Wiring Rules, Victorian Service and Installation Rules, other Australian Standards and Yarra Valley Water specifications and requirements.